Tag Archives: CCC
The Climbing Structure at the New Center
Children's Model and Blueprints of the New Center
After spending months of investigating the big concept of scale and structure, the Beaver children collaboratively developed their own idea of what the new center would look like. With guidance and facilitation from the teachers, they created two blueprints and based on the second blueprint, they constructed a 3-D model.
[wppa type=”slide” album=”83″ size=”500″][/wppa] [wppa type=”slide” album=”86″ size=”500″][/wppa]
CCC Closed: Friday, February 7, 2014 for ECSTEM Conference
The CCC will be closed as staff will be attending the ECSTEM (Early Childhood Science Technology Engineering Math) Conference.
New Center Schedule and Construction Photos
June 2012 – Design-Build Team selected
July 2012 – Caltech Community Forum occurs, Neighborhood Meeting occurs
December 2012 – Construction Documents completed
February 2012 – Construction Begins
June 2014 – Move in
[wppa type=”slide” album=”95″][/wppa]

